Green NYC History & Maps

From Fresh Kills Landfill to Freshkills Park: A History

How Staten Island's Fresh Kills Landfill opened in 1948, closed in 2001 and is becoming a 2,200-acre park, checked against Freshkills Park and NYC sources.

Key takeaways

  • Fresh Kills Landfill was established in 1948 on tidal creeks and coastal marsh, and its last barge of city garbage arrived on March 22, 2001.
  • The site took in about 150 million tons of household waste and, at its peak, up to 29,000 tons a day.
  • Freshkills Park covers 2,200 acres and is being built in phases, with full opening targeted for 2036.
  • North Park, the first section inside the former landfill to open to the public, opened on October 15, 2023.
  • Landfill gas from the site is refined into pipeline-quality natural gas, and leachate is collected and treated before discharge.

For half a century, New York City’s household trash went by barge to the western shore of Staten Island and was piled into four enormous mounds. Today those mounds are capped, planted with native grasses and slowly opening to the public as Freshkills Park. This is the story of how that happened, told through the official park timeline, City records and reporting on the site’s ongoing care.

Before the landfill: creeks and marsh

It is easy to forget that the site was once wetland. According to the Freshkills Park FAQ, the area was mostly tidal creeks and coastal marsh before 1948. The name itself is a clue to that watery past: the FAQ explains that “kill” comes from a Middle Dutch word for a riverbed or water channel, the same word you hear in the name of the nearby Arthur Kill.

1948–2001: a “temporary” dump that kept growing

The park’s official timeline records that Fresh Kills Landfill was established in 1948 by Robert Moses and the City of New York. Waste Dive’s history of the site notes it was initially presented as a temporary measure, yet it outlasted the city’s other disposal sites by decades.

The scale is hard to picture:

  • The landfill footprint covered about 450 acres of the larger site, and it received roughly 150 million tons of household waste, mostly non-hazardous garbage, according to the park FAQ.
  • At its peak it accepted up to 29,000 tons of waste a day and was considered the largest active landfill in the world, per Waste Dive.
  • The waste formed four mounds, known today as the North, South, East and West Mounds, ranging from about 90 to 225 feet tall.

Closing the landfill

Closure came in stages, set by a state consent order and then by state law. The park timeline lists the key steps:

Year Milestone
1990 A consent order between the NYS Department of Environmental Conservation (DEC) and the City sets terms for closing the landfill
1996 A state law requires the landfill to stop accepting solid waste by December 31, 2001; the South Mound is capped
1997 The North Mound is capped and East Mound capping begins
March 22, 2001 The last barge of municipal solid waste arrives
2011 East Mound capping is completed

Waste Dive reports that West Mound capping was finished in 2021, completing the final cover on all four mounds.

September 2001

Months after the last garbage barge, the site took on a very different role. The park FAQ explains that after September 11, 2001, about 1.2 million tons of material from the World Trade Center site was brought to Fresh Kills and screened, and the remaining material was placed in a 48-acre area on the West Mound. National Geographic reports that this part of the site, West Park, is planned as a 9/11 tribute. Families visiting with children may want to talk about this part of the history before they go.

Engineering a park on top of garbage

A capped landfill is not a finished product; it is a system that needs care for decades. The landfill engineering page describes a final cover built in six layers, from the bottom up:

  1. A compacted soil barrier over the waste, graded to slopes between 4% and 33% under DEC requirements.
  2. A gas venting layer that steers landfill gas toward vents and wells.
  3. An impermeable liner of clay and/or plastic that keeps rain out and gas in.
  4. A drainage layer that carries water off the slopes.
  5. A barrier protection layer at least 24 inches thick (deeper where trees are planted).
  6. At least 6 inches of planting soil for native grasses.

Two by-products still need managing:

  • Landfill gas, mostly methane and carbon dioxide, is drawn through wells and underground pipes under vacuum. The park FAQ says it is refined into pipeline-grade natural gas for Staten Island homes. Waste Dive counts more than 572 gas collection wells on site.
  • Leachate, the liquid that forms as waste breaks down, is collected and treated. Solids leave the site as sludge and the treated water is discharged into the Arthur Kill, according to the FAQ.

The FAQ says the Department of Sanitation (DSNY) maintains these systems under DEC regulation, with regular monitoring of air, surface water and groundwater. Waste Dive reports that closure and post-closure costs have passed $1 billion and that about 6.2 million tons of soil have gone into the final cover.

Designing Freshkills Park

Planning for a park began before the landfill closed. Highlights from the official timeline:

  • 1999: An organizing committee forms to sponsor an international design competition.
  • 2001: The competition is announced on September 5, and in December the firm Field Operations places first among three finalists.
  • 2003: Field Operations is selected as planning and design consultant.
  • 2006: The Draft Master Plan is released.
  • 2012: Superstorm Sandy hits on October 29; the timeline notes the site’s wetlands and mounds acted as a buffer.

The Mayor’s Office announcement states that park construction began in 2008. Since then the park has opened from the outside in:

Opened Section
October 2012 Schmul Park (redesigned), the first complete park project
April 2013 Owl Hollow Fields
2015 New Springville Greenway
October 15, 2023 North Park, Phase 1

North Park is 21 acres and was the first section inside the former landfill to open to the public. The City’s announcement lists walking and cycling paths, an overlook deck, a bird-viewing tower, a composting restroom that uses no water, solar power for the restroom and parking-lot lights, and seven acres of native seed plots run by the Greenbelt Native Plant Center.

The park as a whole covers 2,200 acres, and the FAQ describes it as the largest landfill-to-park project in the world. National Geographic notes it will be nearly three times the size of Central Park. The City’s target for full completion is 2036.

Nature comes back

The native grasses planted on the capped mounds have turned the site into what the park FAQ calls the largest grassland habitat in the region, supporting rare grassland birds. Commonly seen animals include songbirds, waterbirds and raptors, white-tailed deer, muskrats, painted turtles, blue crabs and striped bass. The FAQ adds that ongoing research suggests the site’s wildlife is as healthy as wildlife elsewhere in the city. If you are new to identifying birds, our beginner birding guide is a good place to start before a visit.

Visiting today

Plan around what is actually open, and check the official site first:

  • Most of the site is still closed to the public. The FAQ says access is through scheduled tours and events, listed on the Freshkills Park website.
  • Programs have included kayaking, photography, hiking, volunteer projects and group tours. Mountain biking, barbecuing and off-road vehicles are prohibited.
  • The waterways are rated only for secondary contact such as boating, kayaking and catch-and-release fishing. The FAQ says they are not suitable for swimming, drinking, cooking or bathing.
  • Hours, event dates and transit options change, so confirm details on the park’s site before you set out.

Why this history matters

Fresh Kills is a reminder that “throwing away” always means sending things somewhere. Every bottle that gets recycled and every banana peel that gets composted is one less thing headed for a mound like these. Our guides to NYC recycling rules and composting in NYC explain how that works at home today. For the wider story of how New York’s environmental movement took shape, read our history of Earth Day 1970 in NYC.

Before you go

  • Check the Freshkills Park events calendar for tours and programs that need registration.
  • Expect most mound areas to be closed outside guided events.
  • Bring binoculars if you hope to spot grassland birds or raptors.
  • Treat the creeks as look-and-paddle only: no swimming or wading.

Sources

  1. Landfill to Park Timeline — Freshkills Park (NYC Parks and Freshkills Park Alliance), accessed November 13, 2026
  2. FAQs — Freshkills Park (NYC Parks and Freshkills Park Alliance), accessed November 13, 2026
  3. Landfill Engineering — Freshkills Park (NYC Parks and Freshkills Park Alliance), accessed November 13, 2026
  4. Mayor Adams, NYC Parks Commissioner Donoghue Open First Public Space in Freshkills Park, Formerly World's Largest Landfill — Office of the Mayor, City of New York, accessed November 13, 2026
  5. Fresh Kills landfill: RCRA post-closure care, history and operations — Waste Dive, accessed November 13, 2026
  6. From environmental disaster to public park: Exploring Staten Island's Freshkills — National Geographic, accessed November 13, 2026

Rules, hours and programs change. Confirm details with the official source before you go. Spotted an error? Tell us.